Re: Woodfin's SS GT/TB construction series
Dale,
the bulbs you intend to turn on, do those bulbs have two wires [bat & ground?] Are the wires accessible? If so, the MSD three step can apply either bat + or ground to one side of the bulb. The other bulb wire will either be connected to bat + or ground as needed. You can experiment with the setup by using a 3000 chip to test each function. |
Re: Woodfin's SS GT/TB construction series
Dale,
might not be clear, of course I understand the bulbs have bat + and ground. Question, do you have access to the bulb wires [that is to say, the wires are not part of a solid state board.] |
Re: Woodfin's SS GT/TB construction series
about those bulbs, when you find yourself in a hole, quit digging :}
|
Re: Woodfin's SS GT/TB construction series
It's the small MSD light that requires an rpm switch. I was hoping that using a 2 or 3 step would let me activate it at 2 different rpms without trick wiring. Problem is I got all cute and moved my tach into the dash to hide the race car look. Now I can't see my stage rpm with out taking my eyes off the tree. :o. Probably just fab a bracket and get it up on the dash or cage mount it.
Dale |
Re: Woodfin's SS GT/TB construction series
7 Attachment(s)
Yea! Yea! Yea! Yea!
Super parts are in house. One head and intake ready to install. Second head coming next week. Check out these usual views. |
Re: Woodfin's SS GT/TB construction series
4 Attachment(s)
More progress;
waiting on the other head and it will be re-installed in it's Super compartment :) |
Re: Woodfin's SS GT/TB construction series
2 Attachment(s)
The Super engine is as far along as parts allow. I expect to have the other head and engine re-installed next week.
|
Re: Woodfin's SS GT/TB construction series
2 Attachment(s)
The wiring rework will finish this week while waiting on the cylinder head.
The wires hanging down will clear the track OK if I keep the wheels up. |
Re: Woodfin's SS GT/TB construction series
3 Attachment(s)
I received word today {Friday June 3rd} that the new, replacement head is finished and shipped. YEA, YEA, YEA!
The Super engine will be finished and re-installed right away. These photos show more progress with organizing the wiring. Also, the Super 10 is on the rack ready for engine re-install. And the XS D1600 battery I decided to install. |
Re: Woodfin's SS GT/TB construction series
YEA X 10 and YEA!
The new cylinder head is scheduled to arrive tomorrow [Wed June 8th] The engine will be finished and in the Super 10 right away. I have my eye on a July 9th bracket race at Texas Motorplex. Plus two or three more bracket races for tuning both truck and driver. Then Lucas D 4 race at Thunder Road [Shreveport LA] in September |
All times are GMT -4. The time now is 02:46 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Class Racer.com. All Rights Reserved. Designated trademarks and brands are the property of their respective owners.