View Single Post
Old 03-11-2015, 06:43 PM   #273
Dragsinger
VIP Member
 
Join Date: Jul 2008
Location: Liberty City [East Texas]
Posts: 1,760
Likes: 5
Liked 99 Times in 60 Posts
Default Re: Woodfin's SS GT/TB construction series

I "fret" over things! Especially items that are giving me trouble because I am having problems visualizing the details.

Example, engine placement in the Super 10. Because S-10 trucks never came equipped with SBC engines nor 12 bolt rear axles, nor 32 x 14 rear tires it is a challenge to juggle the driveline alignment.

So, after some "fishing lessons" from an experienced friend, I did just like a full tube chassis would be aligned.

I used a full length mandrel [also known as a section of 2 1/2" tubing] through all main caps all the way to the pinion flange.

Photo #1 shows mandrel aligned with pinion [camera angle is mis-leading, it is spot on aligned]

Photo #3 show mandrel out rear of block

Photo #4 shows mandrel out front main

When finalized the pinion will be adjusted about 1.5* down

I like it when a plan comes together
Attached Thumbnails
Click image for larger version

Name:	DSCN0001.JPG
Views:	371
Size:	272.9 KB
ID:	27863   Click image for larger version

Name:	DSCN0003.JPG
Views:	382
Size:	307.8 KB
ID:	27864   Click image for larger version

Name:	DSCN0004.JPG
Views:	347
Size:	293.5 KB
ID:	27865  

__________________
Larry Woodfin 471W
Dragsinger is offline   Reply With Quote