View Single Post
Old 06-23-2015, 06:18 PM   #386
Dragsinger
VIP Member
 
Join Date: Jul 2008
Location: Liberty City [East Texas]
Posts: 1,760
Likes: 5
Liked 99 Times in 60 Posts
Default Re: Woodfin's SS GT/TB construction series

Some minor catch up notes. The last few days have brought several completion items.

*Fuel system plumbing finished
*Brake system finished
*Rear axle assemble finished
*Engine finished
*Transmission finished
*Driveshaft installed
*Shifter installed
*RacePak roughed in
*Most wiring roughed in and terminated on at least one end
*Gauges finished
__________________
Larry Woodfin 471W
Dragsinger is offline   Reply With Quote