More progress on the CobraJet. Hooked up the laptop to the BigStuff ECU and started the engine today so I could check the cam crank advance number. My Browell bellhousing is ready to go in so hopefully I can get it in early this week and finish up a few details by next weekend.

4 inch aluminium driveshaft from Raven Engineering.

Radiator and radiator hoses installed.

View of carpet and seats from drivers side. I found a new carpet that did not have any cut outs in it. I then cut holes for the removable shifter covers.

I fabricated a throttle cable bracket since I am no longer using the drive by wire.

I fabricated a small aluminium bracket to hold the BigStuff air intake temperature sensor right above the throttle body opening.

Here is the bracket to hold the electric water pump drive motor.

From here you can see the Moroso pcv filter and the electric water pump drive motor.
More photos at
http://9500rpm.com/GWCJ/index.html.