Re: 1969 Chevelle Build
Pete doing front end wiring while Dad is searching for bolts, or nuts, or a clip or I don't actually know
Dave plumbing in the line lock to the OEM style replacement brake line system
Pete doing under dash wiring
Chris trimming the stock defroster duct to run the dash mounted water temp on and oil pressure lines.
Pete's level of attention to detail in the 3 wiring shots
Pete's destruction/ construction area
Pete reshaping a p-clip to clamp around the Metri-Pak connector to secure it the fuel system plate. Hence, Pete's attention to detail.
__________________
Andy Friar
|