View Single Post
Old 01-10-2016, 10:52 PM   #87
Andy Friar
Member
 
Andy Friar's Avatar
 
Join Date: Aug 2013
Location: Howell, MI
Posts: 250
Likes: 699
Liked 226 Times in 76 Posts
Default Re: 1969 Chevelle Build

Laying out the shifter location and making a 'lift kit' for it. Trimmed and welded up the Summit Driveshaft loop. Hit it with chassis paint before install. Installed a pair of 2.5# extinguishers right behind the seats with these super rad billet Eddie Motorsports mounts. High quality and well made.

Sealed off the cage holes with flexible adhesive backed modern OEM noise insulation rubber, then 3M foil tape for strength over top. Blue thick mylar tape to hold the wiring in place under the sill trim.
Attached Thumbnails
Click image for larger version

Name:	IMG_4031.JPG
Views:	192
Size:	176.2 KB
ID:	32136   Click image for larger version

Name:	IMG_4146.JPG
Views:	171
Size:	316.8 KB
ID:	32137   Click image for larger version

Name:	IMG_4153.JPG
Views:	199
Size:	180.8 KB
ID:	32138  

Click image for larger version

Name:	IMG_4134.JPG
Views:	180
Size:	206.6 KB
ID:	32139   Click image for larger version

Name:	IMG_4143.JPG
Views:	181
Size:	175.7 KB
ID:	32140   Click image for larger version

Name:	IMG_4135.JPG
Views:	187
Size:	294.6 KB
ID:	32141  

Click image for larger version

Name:	IMG_4156.JPG
Views:	184
Size:	162.5 KB
ID:	32142  
__________________
Andy Friar
Andy Friar is offline   Reply With Quote