Re: 79 Mustang project U/SA
About 6k so far. I over spent on a few things but wanted to do it right the first time. These parts will last a long time and handle the 11 second bracket motor I plan on running most of the time. I don't want to beat my stocker motor at all the local races.
Had a good day on the car Saturday. Finally got all the sound deadener and seam sealer dug out of the car, and cut out a bunch of un needed wires, and got the rubber bushings out of the A-arms. What a pain that was.
|