Update on the rest.
We did get our crank balanced. We also bought a set of Total Seal rings $$$$
Intake acid dipped and painted.
Waiting for bearings to start assembling.
We cleaned up and painted the instrument cluster and bezel around it.
Settled on the switch panel location so we started wiring. So far I am really happy with how the wiring is going and the routing to the glove box.
Tach mounted.
Fuel pressure gauge mounted.
Clutch and flywheel arrived.
Should really see some movement now if we can start assembling the short block!