View Single Post
Old 09-26-2023, 06:17 AM   #2
Keith 944
VIP Member
 
Keith 944's Avatar
 
Join Date: Feb 2006
Location: Dela-where?
Posts: 2,185
Likes: 1,146
Liked 1,854 Times in 573 Posts
Default Re: MSD E mail Techline

Quote:
Originally Posted by SDT1DYI View Post
I'm not sure exactly how to do that.
Running the engine and having three separate switches with a 12V power source and then with a Timing light , put 12V to each wire separately to verify timing changes. Then you would know for sure does each wire operate independently of the other or not.
Someone at MSD has to know the answer that would save the time, expense and effort of doing this.
You can bring it up on the laptop. Monitor timeing on the screen while engine is running,adding power to each, you can be your own switch, have an open +12v wire/ terminal, and touch each wire or all and monitor screen to see results.
__________________
KEITH MAYERS
2-1/2 X somebody
Still many X nobody

Last edited by Keith 944; 09-26-2023 at 06:24 AM.
Keith 944 is offline   Reply With Quote
Liked