|
![]() |
#6 |
Member
Join Date: Feb 2002
Posts: 328
Likes: 64
Liked 345 Times in 149 Posts
|
![]()
At this point the front end was rebuilt as far as I could go for the time being. I was ready to start the tube work but was waiting for a bay to open up at work to get started.
So in the mean time I worked on building the rear housing. First was a mockup and measurements of the rear wheel/tire combination. ![]() Then the rear could begin with welding on the 4 link doubler plates. ![]() ![]() ![]() Housing and 4 link brackets being fixtured up. ![]() ![]() ![]() ![]() ![]() ![]() ![]() Once all the welding was done the housing ends could be fit which is a very time consuming/tedious process to get them perfectly square to the axle centerline. ![]() ![]() A fixture was then made to hold the housing to the chassis table. ![]() About the time I was completing the work on the rear, a bay opened up at work so I transferred the car to its new home. ![]() ...and now tube work could begin. ![]() ![]() ![]() ![]() Last edited by Todd Geisler; 10-16-2021 at 12:05 PM. |
![]() |
![]() |
|
|