HOME FORUM RULES CONTACT
     
   
   

Go Back   CLASS RACER FORUM > Class Racer Forums > .90 Heads Up Class Racing Tech

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 01-21-2011, 09:49 PM   #6
mginnett
Junior Member
 
Join Date: Nov 2007
Posts: 8
Likes: 0
Liked 0 Times in 0 Posts
Default Re: Drive Shaft Tunnel Construction

Thank you very much for the commentary, most appreciated. I think I may end up with a .120 steel tunnel, with 2 each 1" x .065 x 180 degree loops over the outsides well as the passage through the main rollcage hoop.
With the 360 degree setups I have seen, how much of a pain in the arse is it to pull the drive shaft / change the transmission?
This is a 66 Nova super gas style car, eventually will end up running mid to low eights.
mginnett is offline   Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 08:21 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Class Racer.com. All Rights Reserved. Designated trademarks and brands are the property of their respective owners.