|
![]() |
#8 |
Senior Member
Join Date: Mar 2006
Posts: 977
Likes: 799
Liked 275 Times in 76 Posts
|
![]()
Thanks for all of the responses! It was a busy and exhausting time with getting the rough in done with the weather that we have had here. Trenching for power, water and the plumbing to the septic tank was almost too much. I decided to eliminate the floor drains, more out of exhaustion and almost heat stroke than anything. Everything passed with flying colors and the building slab was poured last Wedensday. The slab is a slick finish, so cleanup will be easy. The concrete crew is finishing the driveway tomorrow.
Taking others advice from another thread, I have installed a floor sink in the building where the trailer will be parked to dump the tanks from the trailer. I can't wait to use that instead of dealing with dumping at rest stops or trying to find a place after a long weekend at the track. Thanks Sean
__________________
Sean Marconette 84 Mustang 5060 SS/N |
![]() |
![]() |
Thread Tools | |
Display Modes | |
|
|