Thread
:
Firewall Project
View Single Post
10-25-2009, 07:38 PM
#
3
pro70z28
Junior Member
Join Date: Mar 2008
Posts: 73
Likes: 0
Liked 0 Times in 0 Posts
Re: Firewall Project
Engine side of the flange bored to size for the tubes.
Got everything mocked up. The flanges on the windshield will be added to the inlet side. I'll turn those once I get the V-band clamp. Should be here any day. The outlet side attaches to the carb bonnet with hose & clamp.
pro70z28
View Public Profile
Find More Posts by pro70z28