Great I was going to torque everything as well. Thanks for the suggested timeframe. I shall do the same.
Quote:
Originally Posted by Alan Roehrich
I use 885 at the suggestion of Darin Morgan of RMS and Profiler Cylinder Heads.
I pour each side of the block 48 hours apart. I bolt cylinder heads on during the curing process. And I wait a week after the second side was poured before any other work is done. I torque the heads and mains to spec for curing.
I think the name of the company I buy mine from is Red Cap Supply.
|