View Single Post
Old 03-31-2008, 06:59 PM   #16
Chris1529
VIP Member
 
Join Date: Dec 2006
Location: West Virginia
Posts: 1,366
Likes: 6
Liked 70 Times in 29 Posts
Default Re: IHRA Mooresville Reschedule idea

The construction wasn't a problem coming south. In North Carolina, it is near the 421 exit to WInston-Salem and Boone. There was about a six mile backup coming north.

Then coming north toward the East River Tunnel, the back up started at exit 62. IT was backed up all the way to the tunnel and the left lane was closed in the tunnel, but NO work was goin on. as soon as we went through the tunnel, both laned were open and it was hammer down. THen right beofre princeton, it was down to one lane, but we went through it about 60mph. I still can't figure out the tunnel deal.

I am sure ther is a way around in NC, but in VA, you really don't have much chioce. you can take rt 52, but you still have to merge back on I-77 right before the tunnel.
__________________
Chris Bowman
The Mountain State Mustang
1984 Mustang GT350
Chris1529 is offline   Reply With Quote