Re: Wanted CSR 727 Tranny shield
What I’ve heard from a very good source it’s not a material back log it’s a money problem getting the money to build them I called to order a 904 shield she said it would have to be prepaid and 6-8 wks so I called back 3 months later to order a shield and was told it would be 6-8 wks I said that’s what you told me 3 months ago so if I did order a shield I’d be waiting almost 5 months for a shield that is already paid for what a scam
|