HOME FORUM RULES CONTACT
     
   
   

Go Back   CLASS RACER FORUM > Class Racer Forums > Stock and Super Stock
Register Photo Gallery FAQ Community Calendar

Reply
 
Thread Tools Display Modes
Old 01-29-2010, 08:26 PM   #21
Ben Holt
Member
 
Join Date: Sep 2008
Posts: 142
Likes: 3
Liked 112 Times in 40 Posts
Default Re: New Completed Drag Pak

We are not currently building a Drag Pak car, but will do Pancake's whenever we want to get going on it. We have several SS/AH cars to update, a SS/AA, and a bunch of other projects in progress. Sorry we couldn't get to yours! We now have a better idea of how much time/effort it takes to do one.

And yes, JR Hill painted the car and did an awesome job!! It looks as good underneath as it does on top. Sorry I didn't say it before!
Ben Holt is offline   Reply With Quote
Old 01-29-2010, 08:38 PM   #22
Chris "drooze" Wertman
VIP Member
 
Chris "drooze" Wertman's Avatar
 
Join Date: Sep 2009
Location: Barberton Ohio
Posts: 1,114
Likes: 0
Liked 0 Times in 0 Posts
Default Re: New Completed Drag Pak

Salright, I was just talking to the old man about that yesterday, half of everyone thinks we have screws loose (had, still do...) when we gave them timelines for the car and parts.

But I knew to get it ready for Pomona we had to hit certain milestones by certain points.

We are happier than can be with the work Mike did , and Im sure we would have been equally happy with yours, the timing was super fortunate, otherwise I would have had to do it....and well......while I may have been a pipefitter in my previous life, I can bend and weld and fit.... I know enough to know I dont know squat about chassis and setups like you chassis guys do.....lol (probably why I call you chassis guys)

Pankcake....that was it, I knew you had 2 of em hiding down there at the "undisclosed location"

I couldnt remeber who.

Congrats again. Ill shutup now......

Quote:
Originally Posted by Ben Holt View Post
We are not currently building a Drag Pak car, but will do Pancake's whenever we want to get going on it. We have several SS/AH cars to update, a SS/AA, and a bunch of other projects in progress. Sorry we couldn't get to yours! We now have a better idea of how much time/effort it takes to do one.

And yes, JR Hill painted the car and did an awesome job!! It looks as good underneath as it does on top. Sorry I didn't say it before!
Chris "drooze" Wertman is offline   Reply With Quote
Old 01-29-2010, 09:38 PM   #23
Irv Johns
Member
 
Join Date: Nov 2004
Posts: 178
Likes: 1
Liked 2 Times in 2 Posts
Smile Re: New Completed Drag Pak

Quote:
Originally Posted by drooze View Post
Hard to Type on the road to Atlanta and Loadout for Pomona....Damm loadout took 4 hrs on Wed, then we drove down here to Atlanta for the FI, Tommorow I plumb it here in Atlanta, and next week out to Testing.....

Car is here and theyre still working on it.......

It works well, I hate driving, Dallas is only 12 hrs, so 1 day, hopefully next week the weather is good there for testing, then another 2 days (12 hr driving days) to Pomona.....
Hey I figured you could type and drive.LOL. I thought you were sick ( and still do LOL)
Your approaching 500 post ( a new record in 5 months) good luck on the plumbing..IJ
Irv Johns is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 02:51 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Class Racer.com. All Rights Reserved. Designated trademarks and brands are the property of their respective owners.