|
![]() |
#6 |
Banned
Join Date: Feb 2008
Posts: 852
Likes: 0
Liked 0 Times in 0 Posts
|
![]()
If cross drilling and rod drilling is not done at the correct angle for the stroke it ( the cross drilling) will shut oilling to the rods at about 7600 and above.
|
![]() |
![]() |
|
|