|
![]() |
#4 |
Member
Join Date: Mar 2005
Location: Sweden
Posts: 125
Likes: 0
Liked 0 Times in 0 Posts
|
![]()
The Viper was bought december 2004 from a Microsoft Excecutive :-) I shipped it directly to Lamb to take measurements so we could get a 5-lug bolt pattern for the front hubs.
After several test and a lot of research they found out what could work and the Chassi was transported down to Phil Mandella...the work could begin. This was about January/February 2005. Phil and the guys dismantled the Viper and shipped all small parts to Sweden. After the Chassi was cleaned out the fabrication could start. The Viper have a quite rigid chassi original and with the complete cage/tubbing it is rock solid. The fabrication work with the chassi took about 6 months. When ready the Viper was shipped to California Shipping to a container headed for Sweden! Last edited by JP; 10-05-2013 at 04:08 AM. |
![]() |
![]() |
|
|