|
![]() |
#17 |
Member
Join Date: May 2010
Posts: 102
Likes: 6
Liked 88 Times in 28 Posts
|
![]()
At St. Catharines blocks would come down line upside down. Bore size was stamped on pan rail ( A,B,C ) etc. Workers would choose matching piston-rod assembly and install main bearings. Then place in order beside engine. Then we would pop them in and install cap and nuts.
|
![]() |
![]() |
|
|