|
![]() |
#1 |
Senior Member
Join Date: Apr 2005
Location: Texas
Posts: 644
Likes: 63
Liked 646 Times in 140 Posts
|
![]()
Was the parking at the Indy race this weekend like it has always been? Any idea if the parking switch they showed on their plans last year will be in effect at the US Nationals?
|
![]() |
![]() |
![]() |
#2 |
Member
Join Date: Aug 2010
Location: Seymour, IN
Posts: 114
Likes: 11
Liked 8 Times in 3 Posts
|
![]()
Everything is the same. Hopefully the new tower will be completed by then as it does look really nice. I love IRP but it definitely needs to be updated.
__________________
Ryan Haag SS/EA 3750 E/SA 3750 Last edited by Ryan_Haag; 08-10-2025 at 07:29 PM. Reason: Spelling correction |
![]() |
![]() |
![]() |
#3 |
VIP Member
Join Date: Feb 2014
Location: Derby City, USA
Posts: 3,645
Likes: 1,085
Liked 7,965 Times in 1,524 Posts
|
![]()
Mike , as Ryan said they are in the process of completing the new Tower…..it looks great. The NEW main entrance AND parking switch is still years down the road …..
|
![]() |
![]() |
![]() |
#4 |
Senior Member
Join Date: Apr 2005
Location: Texas
Posts: 644
Likes: 63
Liked 646 Times in 140 Posts
|
![]()
Thx guys!
|
![]() |
![]() |
![]() |
#5 |
VIP Member
Join Date: Dec 2001
Location: Pontiac,il.
Posts: 1,205
Likes: 286
Liked 983 Times in 198 Posts
|
![]()
I talked to a few of the tower construction people and they said it will be done for the big go. The talk was that after the fall classic( 3rd week in October ) the west side will get torn up for the new drainage system that will go right down the middle of the existing pit area and the repair shop building as they call it will come down. They have already torn down some of the unused buildings, houses, barns on the west side making for more pit space there than there has ever been. The east side pit, which is now the pro pit, is in real need of a repaving job. Pot holes every where. It resembles an Illinois road system. .LOL
|
![]() |
![]() |
Liked |
![]() |
|
|