|
![]() |
#3 |
Junior Member
Join Date: Sep 2005
Posts: 53
Likes: 0
Liked 0 Times in 0 Posts
|
![]()
Bader said the two layers of asphalt have delaminated from each other. There is a several hundred foot section of track near the finish line that has to be completely removed and replaced. He said it was not a drainage issue. Once the water gets between the two layers it will start to seep up when the sun comes out. At the LODRS he said there was no way it would get fixed before the national event so he would probably wait until the fall.
|
![]() |
![]() |
|
|