HOME FORUM RULES CONTACT
     
   
   

Go Back   CLASS RACER FORUM > Class Racer Forums > Stock and Super Stock
Register Photo Gallery FAQ Community Calendar

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 02-02-2010, 08:22 AM   #11
Chris "drooze" Wertman
VIP Member
 
Chris "drooze" Wertman's Avatar
 
Join Date: Sep 2009
Location: Barberton Ohio
Posts: 1,114
Likes: 0
Liked 0 Times in 0 Posts
Default Re: 2009 Dodge Challenger Project

Hey Mack, just had a thought, have a 2nd trunk lid painted up with the spoiler on it for show and non-sanctioned events.

Just a thougth.....

Quote:
Originally Posted by Mack Reeves View Post
I hope to be ready mid year... Tim tells me 6 to 8 more weeks in the chassis shop. Paint another 8 weeks and then wiring and plumbing, tune up, test n tune and then to the track. Hope before but in reality it will be mid year if all goes well..... Thanks for asking... Mack

Oh, the rear spoiler yes, I like them better with it also......
Chris "drooze" Wertman is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 06:18 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Class Racer.com. All Rights Reserved. Designated trademarks and brands are the property of their respective owners.