|
![]() |
#15 |
Member
Join Date: Dec 2012
Posts: 227
Likes: 4
Liked 162 Times in 45 Posts
|
![]()
The permit very plainly states that all permited loads must enter all open weigh stations, then you just follow the arrows. I have never had them look at the permit, but there is always the first time, they usually green light me down the front.
|
![]() |
![]() |
|
|