|
![]() |
#3 |
Member
Join Date: Nov 2001
Location: LEXINGTON NC.
Posts: 389
Likes: 43
Liked 18 Times in 7 Posts
|
![]()
Construction starts around exit 68 down to exit 49 North & South bound. South bound is the bad side.Exit 49 is the race track exit.
|
![]() |
![]() |
|
|