|
|
![]() |
#1 |
Junior Member
Join Date: Jan 2019
Posts: 96
Likes: 98
Liked 210 Times in 45 Posts
|
![]()
[QUOTE=BOB KIRKBRIDE;591047]Being is this has been an ongoing problem at this track, why during the dry time of year why haven't they graded that area and at least put in base rock, graded it and compacted it with a roller? Problem solved, guess they are too cheap.[
this actually made me laugh out loud |
![]() |
![]() |
Liked |
![]() |
|
|