HOME FORUM RULES CONTACT
     
   
   

Go Back   CLASS RACER FORUM > Class Racer Forums > Stock and Super Stock Tech
Register Photo Gallery FAQ Community Calendar

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 12-31-2020, 05:41 PM   #3
6130
Member
 
Join Date: Jul 2012
Location: Texas
Posts: 409
Likes: 295
Liked 117 Times in 50 Posts
Default Re: How much labor would be involved in an SS/VX teardown?

Quote:
Originally Posted by Rory McNeil View Post
I think the VX class is more of a Modified program, so weight, cubic inches, and part numbers and easily measured items like carb bores, etc. I don`t think they would require the head to come off . And if they did, pretty sure most VW racers would have the engine on the ground before most vehicles would have the radiator drained!
Yeah, it would be little more than just the four bellhousing bolts, throttle cable, fuel line, and one electrical connector for the crank trigger.
6130 is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 12:06 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Class Racer.com. All Rights Reserved. Designated trademarks and brands are the property of their respective owners.