HOME FORUM RULES CONTACT
     
   
   

Go Back   CLASS RACER FORUM > Class Racer Forums > Stock and Super Stock
Register Photo Gallery FAQ Community Calendar

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 01-13-2009, 11:17 AM   #2
Robert Pare Racing
Member
 
Robert Pare Racing's Avatar
 
Join Date: Aug 2004
Location: Mother Earth
Posts: 265
Likes: 0
Liked 2 Times in 1 Post
Default Re: Old Moroso in trouble with contractors

If there is an AIA Prime Contract as the Contractor stated there is, the Developer needs to pay...Just because the market has had a downturn and the market rates have plummeted since the time of Contract execution, that's just tough.. Win some, lose some..If the market had done the opposite, which it will eventually, do you think the Developer would exclaim that the Contractor deserves MORE money as a result?..I don't think so. My Company is in this very situation presently, and The Developers and Owner Reps are abusing the current situation in the industry by holding a gun to our heads to settle just to get paid "something", arguing about agrred upon terms and conditions that were signed earlier in 2008. Makes me want to **** someone in the mouth when I read this ****.
__________________
Rapare-Racing.com
Robert Pare Racing is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 03:04 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Class Racer.com. All Rights Reserved. Designated trademarks and brands are the property of their respective owners.