|
![]() |
#15 |
Junior Member
Join Date: Aug 2018
Location: Colorado Springs Colorado
Posts: 28
Likes: 2
Liked 85 Times in 15 Posts
|
![]()
Today I finished my line hone, set housing bore to 2.4914. Next I will clean the block and set up for decking, assembly height:
Stroke 3.00 Rod length 5.698 Comp height. 1.800 Total height. 8.998 I need to decide which head gasket thickness I will use, then I will cut the block. Last edited by MIKE JONES 302; 09-03-2018 at 08:21 PM. |
![]() |
![]() |
Liked |
|
|